Submitted by admin on Mon, 08/08/2022 - 08:27

Insufficient real-time monitoring data

Sequence Number 8 Industry Energy Banner Insufficient real-time monitoring data How 5G enabled

With 5G support for large numbers of sensors, low latency and high data throughput it becomes possible even for large utility power networks to collect all needed types of data

Data Flows
Title Devices Icon Peranti Description
  • Wide range of sensors collecting timeseries data
  • Making sure sensors at all critical locations
  • Camera – images to know at any one time physical status
Title Connectivity Icon Ketersambungan Description
  • Using 5G to get data to edge or Cloud storage
Title Edge Compute Icon Pengkomputeran Edge Description
  • Latency critical data could be stored and (AI) processed at the edge
  • Make a list of scenarios when edge is important and should be used over cloud,
Title Cloud Compute & Storage Icon Pengkomputeran Awan & Stor Penyimpanan Description
  • All data to be stored in Enterprise storage to ensure enterprise ownership
Title Applications & Services Icon Aplikasi dan Perkhidmatan Description
  • AI (ML) based apps for IT based data covering  various availability aspects.​
  • Include MV for images.​
Title Inform Decision Makers Icon Memaklumkan pihak pengurusan Description
  • Only in case of issues reporting to Operations.
Title Support Decision Making Icon Menyokong proses mencapai keputusan Description
  • End of process
Application Logic
Description
  • In the case of an Power Utility a large geographical area needs to be covered and therefore sensors need to be installed at many critical locations; 5G is the key technology to connect these sensors nationwide to Edge and Cloud storage.​
  • Cameras also to be used to collect the visual status of certain utilities to be used for AI-MV to check that equipment is not seriously damaged.​
  • Other data needed: SAP Asset data; Production data; Critical customers; etc. 
Description
  • Also link this to Digital Twin so there is as well a 3D image of the sites and power utility.​
  • Linking 5G and Digital Twin gives a real time 3D image of the Utility with all critical data included real time.​
  • Linking SMEs + Data Scientists + Data Engineering staff to single team driving this.​
  • Looking at latest generation of sensors: Options and Costs difference. 
Description
  • As output we have an integration of Digital Twin and underpinning real time data sources to have a real time picture at any one time.​
  • Set up should be ready for autonomous decisions in part of the network.​
  • Interconnection of Power Generation and Utilities to get to an optimised end to end experience​
  • Be ready for a very distributed set up and therefore data collected at many points.
Expected benefits Key value created